Lighting Simplified.

For general contractors

Keep the lighting package aligned when the project changes.

For a GC, the lighting problem is often coordination rather than product discovery alone: which fixture was priced, which revision was approved, what changed, who accepted the alternate, and what is actually shipping.

Scope drift

The lighting package changes between bid, submittal, quote revision, and order.

Substitution ambiguity

An alternate is described as 'equal' without showing where the technical fields differ.

Revision confusion

Teams make decisions from different quote versions or emailed attachments.

Delivery disconnect

The approved fixture package becomes separated from the order and fulfillment record.

Where FindLEDs fits

Keep the lighting package clear through every handoff.

When the project changes, the team can see the current quote, previous versions, product choices, and order status without rebuilding the story from email.

Scope drift

Keep the original request and previous quotes available so the team can see what changed.

Substitution ambiguity

Compare actual product specifications and keep the required project criteria visible before pricing an alternate.

Revision confusion

The current quote is clearly marked, previous versions stay available, and only the current quote can be approved.

Delivery disconnect

The approved quote carries directly into the order, with fulfillment updates in the same project.

Before sourcing

Define who owns the lighting decision.

A clear approval path prevents a technically reasonable alternate from becoming a project problem later.

Which lighting requirements are basis-of-design vs. performance requirements?
Who approves substitutions—owner, architect, engineer, electrical contractor, or another party?
What is the bid / submittal / procurement deadline?
Are alternates being evaluated for cost, availability, lead time, efficiency, or all of the above?
What documents must accompany a proposed substitution?
Which fixture types create the most schedule risk if delivery moves?
Who needs access to the current quote?
Does the project have phased delivery or multiple ship-to locations?
Need to evaluate an alternate?

Use catalog comparison to review technical differences, choose the needed configuration, and add it to the project. Final acceptance still follows the project’s approval process.

Compare product families